Sprachen: DeEn

Search


A pilot system- A world wide first

The German Federal Government for Reactor Safety, Environmental and Nature Protection in Berlin are incorporating Therm Liner project from Uhrig Kanaltechnik GmbH in their new office Buildings.
This is the first Therm Liner System worldwide to be built into a heat pump as a gas compression - evaporation system.
more

Home \\ Projects \\ Plant in Bad Cannstatt

TERROT AREAL Bad Cannstatt

The company Uhrig Kanaltechnik has installed during a night building site their energy recovery system Therm Liner. This system recovers energy from waste water.

The work was carried out during the night hours without any major over pumping or water control causing no night disturbance which has enriched the night life in Bad Cannstatt.

The waste water that flows constantly in large quantities through the sewers under our cities has, up to now, been neglected as an energy source.
The energy that exists in this waste water can be used to heat or to cool buildings.
The Therm Liner System from Uhrig is installed into the existing Sewer network and the waste water simply flows over the elements. The energy is then extracts by means of a heat pump system and introduced into the buildings existing heating or cooling system for use.



Project information for Heating System TERROT AREAL Bad Cannstatt:

  • Sewer Pipe: Semi circular pipe
  • Rate of Flow: 200 l/s
  • Energy Requirement: 168 kW
  • Energy recovered from Waste Water: 120 kW
  • Length of Therm liner system: 76 m
  • Energy saving: approx. 42 %
  • CO² Reduction: approx. 43 %
  • Total costs of Energy supply: 200.000,00 €
  • Amortisation: < 15 years

For further information you can download the following Pdf-Document.